欧美性第一页在线免费观看 五月亭亭色宗合妓女 亚洲黄色在线线路一 国产精品一精品二

Bookmark this site SitemapContact Yixin  中文

Welcome toAnqiu Yixin Machinery Co., Ltd.Official website!

Yixin Machinery

Anqiu Yixin Machinery Co., Ltd.Constantly innovating and committed toproduct development, update and improvement

Service Line:15866407777

Popular Keywords: S-L separation KuangShanXiXuan
Current Position Index > 新聞中心> Briefly describe the installation operation of the drum vacu

Briefly describe the installation operation of the drum vacu

Pageviews:1265?? Release Date:2021-07-31

(1) Level the rack, frame and frame at the same time, place the rack in place, and connect the racks according to the instructions in the manual. After the level is corrected, the rack should be securely fastened.

 

(2) The tape roller, the roller supporting the tape is fixed on the frame, and after leveling, the rubber filter tape is spread on the roller. The driving roller and the driven roller are hoisted to the middle, that is, the middle of the rubber filter, and then moved to the two ends, respectively, and the bracket and the bearing seat are installed.

 

(3) Assembling and seating the vacuum box components, connecting the vacuum boxes in sequence, and aligning them with the small rollers, the lifting mechanism, the winch frame, etc., and tightening the frame and the frame with bolts. .

 

(4) Install the feeding device, the washing device small roller, the filter cloth tensioning device, the filter cloth adjusting device, and the scraping device.

 

(5) Install the connecting hose, and require tight connection without leakage.

 

(6) Drive the device, position the drive frame, install the reducer and the coupling, and ensure the coaxiality between the drive roller and the motor shaft.

 

(7) The pneumatic system, air control and deflection cylinder are connected by high pressure hose.

 

(8) Piping system, joint feeding, washing, cleaning and vacuum system piping.

 

(9) Electronic control system, connecting electric control cabinet and drive motor, gas control cabinet, joint and pipeline valve.

 

(10) Filter cloth, place the gravity roller of the filter cloth in the loosest position of the filter cloth, find the arrow of the movement direction of the filter cloth, and then pass the filter cloth through the feeding box, the washing box, the driving roller, the filter cloth gravity and the deviation Roller, roller, etc., flatten it, butt the two ends of the filter cloth and thread the wire. Check the flushing line before installing the filter cloth to ensure that all nozzles can flush the net filter cloth.

 

上一篇:沒有了

下一篇:Safety requirements for vacuum drum filters

  • TELTEL15866407777
  • ContactContactManager Hao
  • 郵箱郵箱
  • Company AddressCompany AddressMinghu North Road, Anqiu Economic Development Zone, Weifang City, Shandong Province
Anqiu Yixin Machinery Co., Ltd. 備案號:魯ICP備19026764號-1   
贡山| 五指山市| 海城市| 赣州市| 金华市| 孙吴县| 客服| 合水县| 长沙市| 商丘市| 静安区| 台北县| 阳江市| 襄汾县| 宜良县| 广德县| 仁布县| 常熟市| 渝北区| 白山市| 绥江县| 静乐县| 新田县| 治多县| 上饶县| 称多县| 京山县| 海原县| 安图县| 始兴县| 景谷| 萍乡市| 博罗县| 城固县| 洪洞县| 泰宁县| 崇仁县| 娄底市| 永顺县| 凤山县| 治县。|